This page contains a Flash digital edition of a book.
More shipyards migrate to MARS


A growing number of shipyards are specifying the MARS ERP system as part of their design soſtware packages.


S


ome 60 shipyards worldwide use Danish company Logimatic’s (ERP) enterprise resource planning product


MARS, first introduced 18 years ago, but uptake of the refined product shows little sign of slowing down. MARS is a vertical ERP system especially


developed for shipyards, with the information flow of all core yard processes integrated. Tere are four major applications: MARS Material for material management, MARS Production for production management, MARS Planning for resource planning and control, and MARS Tendering for cost estimation. ‘Significantly increased production


efficiency has been reached with MARS,’ Ivan Siksne-Pedersen, sales director at Logimatic toldTe Naval Architect. MARS is built around industry-


standard tools, including Oracle three-tier architecture. It is compatible with office tools and CAD systems. It can be run as a traditional client/server solution and in web architecture. A core feature for the success of MARS is the planning module. Some years ago a company specialised in systems for shipyard resource planning was acquired, and the software has now been further developed and fully integrated in the MARS Material module. The MARS Planning module includes main planning, detail planning, design


The basic plan for implementing the MARS system at a shipyard.


planning, and space management, for planning quays, production halls, cranes, storage areas, space, etc. ‘All recent yard contracts have also


included the MARS Planning module, emphasising the importance of logistics planning for newbuilding and repair yards,’ Mr Siksne-Pedersen said. MARS supports tendering and pre-


calculation, project establishment and planning, project and budget control, design and engineering, material definition, material management, procurement, warehousing, production control, subcontracting, document management, drawing management, tool management, and aſter-sales. Trough its modularity it is straightforward for shipyards to maintain existing IT systems, or parts of these, and integrate them with MARS. Logimatic has a staff of 115 based in


offices in Aalborg, Denmark; Germany; Beijing, China; and in the USA, with one further office currently being set up. Recently, Shanghai Shipyard and CSSC CDP acquired MARS. Shanghai Shipyard will implement all three main modules of MARS, resource and project planning, material management, and production control, at its two construction sites. CSSC Central Purchase Department


in Shanghai (CPD) is a newly-established organisation which will be in charge of purchase of materials and other deliveries for the entire CSSC shipbuilding group. When fully operational, CPD will have the largest purchasing volume of all shipbuilding organisations globally. ‘Last year, new clients included the major


US shipbuilders Northrop Grumman and BAE Systems, and we expect to be able to announce some other major new contracts in the USA and Asia this spring,’ said Mr Siksne-Pedersen. Recent major contracts include an ERP


frame agreement with Aker Yards, eight yards of which already use MARS. Other ERP clients include Dutch IHC Holland, Nam Trieu Shipyard in Vietnam, and Estaleiro Atlântico Sul in Brazil – which is implementing MARS at its new shipyard being built in Recife. Turkish Sedef Shipyard also recently upgraded its MARS installation with the planning module.NA


20 years in China – now in Vietnam


We link European shipowners to Chinese and Vietnamese shipbuilding. With more than 100 new buildings, we off er you expertise in bulk carriers, gas carriers, multipurpose, ferries and general cargo.


Design offi ce in Copenhagen and Shanghai. Naval architects & marine engineers. www.grontmij-carlbro.dk


The Naval Architect April 2008


21


Feature 1


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72